1) We actively participate in project conception attending initial meetings with clients. We have the experience to ask the questions to help coordination and prevent confusion or change orders later.
2) With the Design Development Set (DD Set) we provide the cut sheets for the equipment that we are proposing to use on the project, complete with dimensions, power requirements, and installation requirements. We provide drawings that detail the space required for the proposed equipment and large ducts or piping. We then encourage all parties involved to review the DD Set and proceed when all parties agree on the basic design criteria.
3) We provide progress sets as required by the client. We strive to replica
watches uk meet all deadlines provided, we understand that any delay in our work causes extra work for others and find it unacceptable.
4) We provide documents in the format requested by the client, only after a very thorough in house review. It is our goal to provide documents that are complete, accurate, and clear on objectives.
5) We prefer to actively participate in the pre-bid walk through, to provide support for the client and to answer any questions that arise.
6) We support the construction process completely with support for; Plan review responses, substitution requests, value engineering, submittal review, request for information, and change order reviews. It is our goal to help the project run smoothly and timely with quick turn around on all our responses.
7) We are very skilled in project close out, very detailed oriented and only send individuals familiar with the project to conduct site visits, and write construction reports. Every report from our office is clear and precise, the bid documents are referenced for any item mentioned in the report.
8) We offer to provide redline drawings in PDF or CAD format, along with review of all close out documents such as Operation and Maintenance Manuals (O&Ms). We verify all warranty information is filed out and all equipment has the correct factory startup as required for complete warranty.
1) We actively participate in project conception attending initial meetings with clients. We have the experience to ask the questions to help coordination and prevent confusion or change orders later.
2) We have the background in preventative maintenance, repair and replacement of existing mechanical systems to make good decisions on the future of the mechanical systems. We spend time with the client and ask the right questions to understand the client’s facility. We walk, crawl and climb as required to learn the entire system that is being reviewed.
3) With the Design Development Set (DD Set) we provide the cut sheets for the equipment that we are proposing to use on the project, complete with dimensions, power requirements, and installation requirements. We provide drawings that detail the space required for the proposed equipment and large ducts or piping. We then encourage all parties involved to review the DD Set and proceed when all parties agree on the basic design criteria.
4) We provide progress sets as required by the client. We strive to meet all deadlines provided, we understand that any delay in our work causes extra work for others and find it unacceptable.
5) We provide documents in the format requested by the client, only after a very thorough in house review. It is our goal to provide documents that are complete, accurate, and clear on objectives.
6) We request to actively participate in the pre-bid walk through, to provide support for the client and to answer any questions that arise. We lead the contractors through the facility, showing them the systems being altered. We believe this is the first step in building a relationship with the contractor working on the project. It gives us an opportunity to gain respect from the contractor and let the contractor know that we have climbed, crawled, walked the entire system. It gives the contractor the confidence that when he sends through an RFI that someone knowledgeable of the system and conditions will be responding.
7) We support the construction process completely with support for; Plan review responses, substitution requests, value engineering, submittal review, request for information, and change order reviews. It is our goal to help the project run smoothly and timely with quick turn around on all our responses.
8) We are very skilled in project close out, very detailed oriented and only send individuals familiar with the project to conduct site visits, and write construction reports. Every report from our office is clear and precise, the bid documents are referenced for any item mentioned in the report.
9) We offer to provide redline drawings in PDF or CAD format, along with review of all close out documents such as Operation and Maintenance Manuals (O&Ms). We verify all warranty information is filed out and all equipment has the correct factory startup as required for complete warranty.
1) We have the experience to conduct initial project design meetings, to set up and coordinate all parties required. We have the contacts to cover all areas of construction including but not limited to Architects, Structural Engineers, Civil Engineers, Electrical Engineers, SB1149 Professionals, LEED Certified Professionals, General Contractors, Sub Contractors.
2) We provide support through the project design, with coordination of individual disciplines, design objectives, design progress deadlines, we set up and conduct design meetings.
3) We support the project through the construction phase fake
watches through preconstruction meetings, construction meetings, schedule reviews, billing reviews, schedule of values, request for information processing, complete close out services.
4) We keep complete and accurate logs of all paperwork processed through out the project, providing a complete project book when the projected is closed out.
5) We follow up with the project prior to the 1 year warranty period to verify that the project is still performing per the client’s requirements. We contact all parties as required to provide any work required per the bid documents or warranty issues.